GoobNet

GoobNet menu

GoobNet

BRINGING THE THRILL OF COOKIES TO YOUR FRONT DOOR

WEEKLY WHINE

HEARTANDSOUL Revision 1 Phase 3 complete

This is the official introduction of the third phase of Revision 1 of the GoobNet Highly Effective Accelerated Railway Transit for Accessing National Destinations with a Special Opportunity to Unify Locations plan.

You can now observe some improvements from the original version of this phase. For example, the earlier introduction of Line 90 means that the Minneapolis/​St Paul to Chicago leg joins as an extension to that line rather than to Line 55. This takes Line 90 up to 1,800 km of track, including the previous leg from Toledo to Hamilton.

As before, the most important part of this phase is the joining of the East and West Coast train networks into one. Lines 10 and 80 now span from coast to coast, and in the next phase, so too will Line 90. The other additions are the extensions of Lines 20 and 95 to Richmond, and the Line 90 extension discussed above.

If you are going to be in the United States area and would like to implement the GoobNet Highly Effective Accelerated Railway Transit for Accessing National Destinations with a Special Opportunity to Unify Locations plan, please send a self addressed, stamped envelope to GoobNet Enterprises, Inc [which doesn’t actually exist however]. That’s right, just address it to GoobNet Enterprises, Inc. It will get to us. We promise.

Actually, if you really want to implement the GoobNet Highly Effective Accelerated Railway Transit for Accessing National Destinations with a Special Opportunity to Unify Locations plan, just go ahead and do it. You totally don’t need our permission.

You may, however, need your taxpayers’ permission.

MAPS AND TIMETABLES

HEARTANDSOUL Phase 3 map

PLEASE SEND ALL INCOHERENT RANTS TO <GOOBNET‍@‍GOOBNET.NET>

© 2018 GOOBNET ENTERPRISES, INC [WHICH DOESN’T ACTUALLY EXIST HOWEVER]

THIS FILE ACCURATE AS OF: THU 06 DEC 2018 – 06:34:52 UTC · GENERATED IN 0.004 SECONDS